kikipeepers asked
During the 1990s, inspections found fatigue cracks and corrosion in the steel around the bridge's joints. Those problems were repaired. Starting in 1993, the bridge was inspected annually instead of every other year. State bridge engineer Dan Dorgan said the bearings could not have been repaired without jacking up the entire deck of the bridge. Because the bearings were not sliding, inspectors concluded the corrosion was not a major issue. After a study raised concern about cracks, the state was given two alternatives: Add steel plates to reinforce critical parts or conduct a thorough inspection of certain areas to see if there were additional cracks. They chose the inspection route, beginning that examination in May. 'We thought we had done all we could,' Dorgan told reporters near the mangled remains of the span. 'Obviously something went terribly wrong.' The collapsed bridge's last full inspection was completed June 15, 2006. The report shows previous inspectors' notations of fatigue cracks in the spans approaching the river, including one four feet long that was reinforced with bolted plates. Although concern was raised about cracks, some experts theorized it's no coincidence the collapse happened when workers and heavy equipment were on the bridge.
201 answers · 0 comments
Answer this yourself in the app
See how this splits by age, gender, and region in the app.